Navigating the FCC LPFM Licensing Process: A Technical Guide for Non-Profits
Phase I: Organizational Eligibility and Community Presence
Before addressing technical frequency availability, an applicant must satisfy the FCC’s strict eligibility criteria for Noncommercial Educational (NCE) status. LPFM licenses are not granted to individuals; they are reserved for specific categories of legal entities.
Eligible Entities
- Non-profit Educational Organizations: Must have a primary purpose that is educational in nature. This includes K-12 schools, universities, and community-based organizations that can demonstrate an educational mission.
- Government/Public Safety Entities: Local government agencies or non-profits providing public safety or transportation services are eligible.
- Tribal Nations: Federally recognized tribes or entities owned by tribes.
The Community Presence Test
To ensure LPFM stations remain truly local, the FCC applies a 'Community Presence' requirement. An organization must meet at least one of the following criteria at the time of application:
| Requirement Category | Top 50 Radio Markets | Outside Top 50 Markets |
|---|---|---|
| Physical Headquarters | Within 10 miles of antenna site | Within 20 miles of antenna site |
| Governing Board Residency | 75% reside within 10 miles | 75% reside within 20 miles |
| Campus Location | Within 10 miles of antenna site | Within 20 miles of antenna site |
Phase II: Engineering Studies and Site Selection
The most common cause for application dismissal is 'technical non-compliance.' Unlike full-power FM stations, LPFM stations are 'secondary' services, meaning they must protect all existing and proposed full-power stations from interference without receiving any protection in return.
Frequency Search and 47 CFR 73.807
LPFM applicants must identify an available channel (between 88.1 MHz and 107.9 MHz) that meets the minimum distance separation requirements from other stations. This is governed by 47 CFR 73.807, which specifies the exact mileage required between an LPFM site and other FM facilities on the same, first-adjacent, second-adjacent, and third-adjacent channels, as well as intermediate frequency (IF) channels.
Technical Parameters: ERP and HAAT
The FCC limits LPFM stations to specific power and height profiles to ensure a localized coverage footprint:
- Effective Radiated Power (ERP): Maximum of 100 watts (0.1 kW).
- Height Above Average Terrain (HAAT): Maximum of 30 meters (approx. 100 feet).
If the antenna height exceeds 30 meters HAAT, the ERP must be reduced according to a specific power-to-height ratio table provided by the FCC to maintain a consistent '60 dBu' interference contour.
The Engineering Certificate
While the FCC provides a 'Channel Finder' tool, professional engineering software is often required to generate a Long-Form Engineering Study. This study must confirm that the proposed antenna location is not within a 'prohibited' zone and that the signal will not interfere with translator stations or reserved band (88.1-91.9 MHz) educational services.
Phase III: Executing FCC Form 318
FCC Form 318 is the legal document submitted through the Licensing and Management System (LMS). It is divided into several key sections, each requiring absolute accuracy.
Key Sections of Form 318
- General Information: Legal name of the applicant, contact information, and 'FRN' (FCC Registration Number).
- Legal Certifications: Attesting to the applicant's non-profit status, lack of character issues (felonies), and compliance with 'alien ownership' restrictions (limiting foreign control to 20%).
- Point System Factors: This is where 'Mutually Exclusive' applicants compete. We will detail this in the next section.
- Engineering Data: Precise GPS coordinates (NAD83 datum), antenna make/model, tower height, and frequency.
The Importance of the 'Anti-Trafficking' Rule
Applicants must certify that they have not acquired the application or construction permit for the purpose of selling it for profit. LPFM licenses are non-transferable for the first three years of on-air operation.
Phase IV: The Point System and Mutual Exclusivity (MX)
When two or more applications are 'Mutually Exclusive' (meaning they cannot all be granted without causing interference), the FCC uses a point-based system to select the winner. It is not a lottery; it is an objective meritocracy.
The LPFM Point Rubric
- Established Community Presence (1 Point): Awarded if the applicant has been in existence as a non-profit and has met the community presence requirement for at least two years prior to the application.
- Local Programing Commitment (1 Point): A pledge to broadcast at least 8 hours of locally originated programming per day.
- Main Studio Pledge (1 Point): A commitment to maintain a publicly accessible main studio with local staff or volunteers during normal business hours.
- Local Programing and Main Studio (1 Point): An additional point if both of the above pledges are made.
- Diversity of Ownership (1 Point): Awarded if the applicant does not hold any other broadcast interests.
- Tribal Applicants (1 Point): For stations serving tribal lands.
In the event of a tie, the FCC may encourage 'time-sharing' agreements where multiple applicants share the same frequency at different hours of the day. If no agreement is reached, the FCC may grant the license to the applicant with the longest continuous community presence.
Phase V: Post-Grant Responsibilities
Once an application is 'Granted,' the FCC issues a Construction Permit (CP). This is not a license to broadcast, but a license to build.
Construction Timeline
A Construction Permit is typically valid for 36 months. During this window, the applicant must:
- Lease or purchase the tower site.
- Install the transmitter, antenna, and EAS (Emergency Alert System) equipment.
- Perform 'Program Test Authority' (PTA) to ensure the signal matches the engineering specs.
- File FCC Form 319 (License to Cover) once construction is complete and the station is ready for regular operation.